Hi
I am having trouble when changing from a short lead time vendor to a long lead time vendor for materials.
After the PO is released for the LLT vendor, SAP wants to reschedule the released PO and deletes the purchase requisitions for the SLT vendor.
This happens inside the info record effective date.
What can I do in SAP to avoid having to place manual purchase order to close in the ordering gap?