Hi All,
The base quantity of BOM is 40000 PC and the usage of the material which is 0.01 PC per 40000. The fixed quantity is not ticked, which means the required quantity will change follow the order quantity. Randomly select a plan order of XXX, the plan order quantity is 236648 PC. Once we Check the component list of the plan order.
The required quantity of material X is 1 PC.
However, the expected quantity should be 236648/40000*0.01 = 0.059 PC
How to correct this incorrect rounding value...