Dear SAP Gurus,
I have gone through lot of Threads related to the same but could not find the relative answer.
My client requirement is as follows:
When MIRO is done with reference to PO the assignment field in Details tab in the T-code; MIRO should be updated with the PO number.
Any help on this is really appreciated.
BR
RR.