Hi everyone,
I've seen a few threads with regards to this automatic PO generation.
I've tried using below:
1. ME59/ME21N: convert PR to PO
2. SM36: create batch job running in background to run ME59 periodically.
Is there any other method in configuration besides these two methods mentioned above, other threads that i've gone through in SCN are either proposing any of these 2 methods.
Thank you,
Regards,